Images of the Taylorsville Redwood Campus during Fall 2012. The images include the Student Center, AD Building, Alder Amphitheater, and the construction of IAB (later renamed to the Academic and Administration Building).
Images of the SLCC Redwood Campus and the demolition site of the Automotive Trades Building where the Instruction and Administration Building, later renamed the Academic and Administration Building, will be built.
A photo of a walkway on a clear, sunny day at Redwood Campus. Students are sitting on the lawn on both sides of the walkway. A row of trees on the left side provide shade.