Project Houses, 1982
Utah Technical College at Salt Lake
1982-05
carpentryarchitectural drawingdraftingelectriciansmasonrybrickworkStudentsConstruction
Open House, May 26th through June 4th. Ribbon Cutting on May 26, 1982. King's Row Subdivision. This invitation/pamphlet covers the bidding process and there is a section on why UTC Project homes are an excellent buy. Each Project House has a page with floor plan, features, and the student crews that worked on the house.
Digitized by: Salt Lake Community College
text
digitized other analog
eng
http://rightsstatements.org/vocab/InC-EDU/1.0/
Original version: SLCC Physical Archives. Archival digital version: SLCC Digital Archives. IN COPYRIGHT.
TIFF image scanned at 600 dpi from the original physical object using an Epson Expression 10000 XL scanner. Converted to PDF with Adobe Acrobat.
16-1534